Year / PeriodCompany / Location ProjectRole / FunctionAmount / Volume
Nov 2023 - Dec 2023Noth of Germany; Power plantCommissioning Manager
April 2021 - Oct 2023German Refinery;
EPC project new flue gas treatment unit, heat recovery unit; site construction managment
Consulting EngineerTotal ~19M€
Aug 2020 - Feb 2021Deutsche Bahn; Nurnberg
Retrofit of ICE 3 Train: optimisation of down time
Senior Project ManagerEng. ~1M€
Total ~3.2 M€ per train
Aug 2019 – Aug 2020Aviretta, Ettringen South-Germany Several projects regarding de-bottlenecking, environmental or quality issuesHead of Engineering and ContractingTotal ~16M€
Dec 2018 – Jul 2019Clariant, Frankfurt, Germany, Shanghai, China Transfer of a flame retard production plant to Dayabay, ChinaSenior Project ManagerTotal ~45M€
Aug 2017 – Nov 2018GRACE, Worms, Germany, Chicago, US New Colloidal Silica plant Concept / Basic & Detail DesignSenior Manager Central Engineering.  Total ~65 M€
Jan 2017 – July 2017APK; Merseburg; Germany New process regarding recycling of multilayer plastics garbageEngineering Manager  Total ~25M€
Mar 2011 – Nov 2016        SGL Carbon; Wiesbaden; Germany; several projects like:Senior Project Manager     
2016SGL Ozark, AR, US New graphitisation plant for electrodes incl. waste gas treatmentSite Project Manager    EPCm: ~50M$      
2014 - 2014SGLLavradio, Portugal, new precursor production line for carbon fibresProject Manager & Lead Eng PipesEPCm: ~ 25M€    
2014 - 2015SGLCoruna, Spain New electrode productionProject DirectorEPCm: ~50M€      
2011 - 2013SGLYangquan, Shx, China New new ringfurnace and waste gas treatment Project Controller  EPCm: ~300MRMB
2011 - 2012SGL Lachute, Quebec, Can Pilot plant for spent pot line recyclingEngineering Manager  Eng.:  ~4.5M€
2011 - 2016Several small (<5M€) refurbishment projects  Project ManagerTotal: ~ 40M€
Apr 2009 – Feb 2011Ferngal GmbH; Wolfen; Germany Start-up of a piping EPC contractor Mostaganem, Algeria Commission of a new pump station and water treatment on behalf of ABBTechnical Director   Commissioning Manager    Com:   ~12M€ Total: ~300M€  
Sep 2007 – Mar 2009BHR; Essen; Germany Surat, Gujarat, India Pre-commissioning and Punch List for a CCPP on behalf of SiemensMechanical Completion ManagerFinalizing MC: 2.5M$ Total: ~ 1.2B$  
Feb 2002 – Aug 2007Lurgi , Frankfurt; Germany several projects like:
2006 - 2007Al Jubail; KSA New CO plant; EPCConstruction ManagerEPCm: ~65M€      
2004 - 2005Asaluyeh, Iran Two new Mega Methanol plants; EP  Technical Consultant    EP: ~280M€      
2003 - 2004Punta Arenas, Chile New Mega methanol plant including tank farm, EPCConstruction Manager    EPC:~ 350M$      
2002 - 2007Several EPC bids regarding petro-chemical plants, Middle and Far East, Southeast AsiaBid / Proposal ManagerEPC Bids up to  1.3 B$  
Aug 1999 – Jan 2002DME Didier, Wiesbaden, Germany Several EPC projects regarding refractory for Hot blast stove plants at Brazil, Germany, RussiaProject Manager & Commissioning ManagerEPCC: ~20M€ (average 3 hot blast stove plant)
Jan 1999 – July 2000Sunvic, Leipzig, Germany EPCC contract regarding the E&I plus heat tracing for a new Acrylic acid plant for CelaneseSite Manager & Claim ManagerEPC: ~40M€  
Oct 1997 – Dec 1998WICOMM, Leuna, Germany Managing successfully three Shutdowns at Refinery “Leuna 2002”Shutdown ManagerAverage per shutdown: ~10M€
Mar 1992 – Sep 1997EC Erdoelchemie, Cologne, Germany Nitric Acid (98.5%) Plant Responsibility for two Butadiene Plants, Tank Farm, construction of new tanker filling stations on the RhinePlant Engineer Project Manager   Maintenance & Shutdown ManagerAverage budget per year: 2 to 6 M€         EPCm: ~150M€